top of page

More services 2007

Two 13 kg gas bottles with manual changeover and bubble tester.  The dividing partition, which prevents the bottle from moving, lifts out.

During the spring of 2007 gas was installed, hot and cold water for the kitchen and bathroom was added. LED lighting was fitted and waste water disposal via a gulper pump was put in.

bottom of page