top of page
More services 2007
During the spring of 2007 gas was installed, hot and cold water for the kitchen and bathroom was added. LED lighting was fitted and waste water disposal via a gulper pump was put in.
bottom of page
During the spring of 2007 gas was installed, hot and cold water for the kitchen and bathroom was added. LED lighting was fitted and waste water disposal via a gulper pump was put in.